December 19, 2024, Disaster! We are Short of Tiles!
Today the conservator's inspection is taking place, and we are missing 4 square meters of tiles... A very nervous atmosphere at the construction site of the chapel. Our contractor went out of his way to bring the missing tiles from Poznań (a shy 300 km dirive), but...
December 13, 2024, Roof at the End!
The fact that we were quiet, does not mean nothing was happening at the Cha-pel...We wrote letters and learned how to work with a conservator. It's not easy. Our application for windows on both sides of the roof was rejected (as recommended by the roofer) and we have...
November 14, 2024 Entrances for Ants and -3C on the Roof
Like almost every week on Friday, it's time for the news from Ka-Plica. Winter has come, -3C on the roof this morning, and our brave team, after warming sausages for breakfast, continues working on the roof. It's slippery there and I don't know how they do it without...
October 24, 2024, A Very Important Meeting
Some very important people visited us today...Today, the inspector from the Provincial Conservator of Monuments discussed with the construction manager, inspector and roof contractor the individual stages of roof replacement and possible installation of roof windows...
October 22, 2024, Dismantling of the Former Altar
Dismantling the table at the former altar turned out to be quite a task.And what looked relatively easy turned out to be a huge job. The table was a brick structure that someone planned to use for something very serious. It could have carry a few tonnes of weight. The...
October 20, 2024, Conservation of the Roof Trusses
Oh, things are happening... in our Ka-Plica!After studying the documents we received from the previous owners, we decided to protect the roof truss as soon as possible with appropriate insecticides. It would be a shame if the new roof fell off, because it had nothing...
September 15, 2024, Flood in the Kłodzko Valley and Our Cha-Pel
The flood disaster in the Kłodzko Valley fortunately bypassed Kudowa Zdrój and our Ka-Plica survived without any flooding.Several holes in the roof sheathing were removed in time and the building was well protected while waiting for a new roof. In the meantime, we...
September 1, 2024 We are preparing to renovate the roof
We are preparing to renovate the roofThe long search for a company that would replace the roof by December 11, 2024, ended in success. Thanks to the subsidy obtained by the previous owner, our renovation will be cheaper by PLN 129,000. This is a significant sum and we...
July 15, 2024, Removing Graffiti from the Walls of Cha-Pel
According to the principle that my grandmother followed: "It may be poor, but it must be clean"... we began removing graffiti from the walls of Ka-Plica. My brave team approached the problem twice to choose the best method. They scraped for two whole days and slowly...